Case study · Official Progress Service Delivery Partner
8 reports in 80 hours: speeding up a JasperReports to Telerik Reporting migration
- Industry
- Industrial manufacturing, US operation
- Migration
- JasperReports → Telerik Reporting
- Engagement
- Consulting sprint in two phases, about 80 hours of expert time
- Stack
- Telerik Reporting, Microsoft SQL Server, .NET, JavaScript
- Team
- One senior Telerik Reporting consultant with the client's engineers
Key results
- 8 complex reports delivered and embedded in the client's web application
- About 10 hours per report, down from about 2 weeks
- About 7× faster report delivery
- Millions of rows rendered smoothly, with no timeouts
- Every deadline met on an aggressive timeline
- Reusable templates and styles that sped up the rest of the migration
Client details are withheld for confidentiality.
The client
A global industrial manufacturer with a large US operation. Its US team relies on hundreds of business-critical reports for daily operations, and was partway through moving them from JasperReports to Telerik Reporting. The developers were capable, but they had little spare time and were still learning Telerik Reporting.
The challenge
The migration had a firm deadline, and the pace at the time could not meet it.
- Speed. Each report took the internal team about two weeks. With hundreds of reports still to move, the deadline was at risk.
- Scale and performance. Many reports ran over millions of rows. That exposed slow spots in data access and rendering, and some reports risked timing out.
- Knowledge gap. The team was still learning how Telerik Reporting works and which settings affect performance.
- Inconsistency. Layouts and styles varied from report to report, and little could be reused.
Our approach
The aim was not only to build reports, but to leave the team able to finish the migration faster on its own.
1. Triage and planning. We picked the reports with the most impact to build first, as reference implementations, mapped their data flows and found the heaviest queries and the slowest rendering steps.
2. Foundation reports. We built 8 complex reports from start to finish (layout, styling, parameters, interactivity) and embedded them in the client’s web application, so users run them where they already work. Each one set the quality bar for the rest of the migration.
3. Performance engineering. Much of the effort went into the database: new stored procedures, tuned against real data volumes together with the indexes behind them, and a simpler data model with smaller payloads and fewer round-trips. In Telerik Reporting we tuned parameters, filtering, paging and caching, so reports over millions of records render without timeouts.
4. Enablement and handover. Templates, the reference reports and a style guide, plus knowledge-transfer sessions on Telerik Reporting best practices, performance guardrails and maintainable patterns.
The results
| Area | Before | After |
|---|---|---|
| Time per report | About 2 weeks | About 10 hours |
| Performance | Slow; timeouts possible | Smooth over millions of rows |
| Consistency | Ad-hoc layouts | Shared templates and styles |
| Capacity | Limited bandwidth | Expert capacity on demand |
Both phases were delivered on time under an aggressive deadline, and the client’s leadership praised the speed, quality and collaboration. The foundation kept paying off after we left: the team used it to move the remaining reports much faster.
“It had been a sincere pleasure working with you and our consultant!” — Product Owner, at the end of the engagement
Lessons for any Telerik Reporting migration
- Build reference reports first. A few well-built, complex reports teach a team more than any guideline document.
- Treat performance as a data problem. Most rendering issues are fixed in the stored procedures and indexes, before the report designer is involved.
- Plan the embedding early. Reports that live inside your application need a repeatable integration pattern, not a one-off.
- Tune the reporting layer as well. Parameters, filtering, paging and caching make a real difference on large datasets.
- Standardise styles early. Shared templates stop each new report from being built from scratch.
- Plan for handover from day one. Faster delivery only lasts if the team can keep it up after the consultants leave.